Project: Bovine-RV14A   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Jeff Lawson   -  
Project:   Vans - RV-14A   -   VIEW REPORTS
Total Hours:601.5
Total Flight Time:
Start/Last Date:Jan 28, 2022 - No Finish Date
Engine:Lycoming YIO-390-EXP119 non-cert
Propeller:Hartzell G2YR/N7605W-2X 74 in. dia composite 2-blade
Panel:Dynon Skyview
 
Friendly URL: https://eaabuilderslog.org?s=Bovine-RV14A

Home or Last Project Picture

Sep 20, 2022     Fuel tank dimpling work - (1.5 hours)       Category: Fuel Tanks
The prep work for the fuel tanks continue with more deburring and dimpling of the stiffeners. I also had to dimple the flange on the fuel tank ribs around the opening where the fuel senders will be installed. The holes in that flange could have been dimpled with a very short yoke, but I needed to use my DRDT2 squeezer instead. Then I marked and cut the two pieces of J-channel that will be needed later. I started the counter-sinking of the Z-brackets, but my powerdrill ran out of battery and it was getting late so I'll have to continue with that tomorrow.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.